Prospecting · Massachusetts · National Grid territory
Shave Which buildings should we call first, and why
Loading
Orientation · Outbound BESS Prospecting

A structured prior over Massachusetts commercial and industrial buildings to identify where a 250 kW / 522 kWh battery captures meaningful demand-charge savings before requesting an electric bill.

Ranked against National Grid’s filed G-2 ($15.06/kW) and G-3 ($10.48/kW) distribution tariffs. Combines MassGIS assessor records, NREL ComStock 15-minute load profiles, and parcel-line exterior wall clearance to separate sharp, shaveable weekday peaks from unserviceable plateaus.

The Inversion

Commercial battery developers traditionally cold-call, request 12 months of utility interval bills, and evaluate feasibility after the fact. Shave inverts the sequence: it screens municipal assessor records and models load shapes to score demand-charge savings before dialing.

The Tariff & Physics

A 250 kW / 522 kWh system (~413 kWh usable) cannot hold down a 6-hour hospital plateau. It excels at sharp 1–2 hour weekday peaks on National Grid’s G-2 tariff ($15.06/kW), which costs 44% more per kW than G-3 ($10.48/kW). Mid-size spiky loads beat large flat loads.

The Pipeline

4,179 parcels screened across Worcester, Fall River, and Lowell. 15-minute load shapes from NREL ComStock and industrial models, root-found against filed billing windows (08:00–21:00 weekdays), filtered by physical exterior wall clearance (≥10 ft).

Opportunity, by parcel Fill = annual saving · Outline = rate class
Higher annual saving Rate G‑2 · $15.06/kW Rate G‑3 · $10.48/kW Clear wall run, selected site Small parcels drawn at a minimum size so every site stays visible and clickable — area encodes nothing.
Ranked by estimated annual demand-charge saving ComStock‑backed

SiteLoad shape Peak / avgRate Saving/yrConf